You don't have javascript enabled. Good luck with that.
Pencarian
Kali Anak Ciliwung di Sawah Besar di Normalisasi

Ciliwung Rivulet Normalization Targeted to Be Complete in March

The river has not been dredged around 30 years

Ciliwung Rivulet located in Mangga Dua Selatan Urban Village, Sawah Besar, Central Jakarta, started to be normalized. Normalization itself takes 800 meters with 10 meters width is targeted to be complete in the upcoming March.

Head of Jakarta Water Management Department, Teguh Hendrawan said, normalization is carried out to restore function of Ciliwung. This is because the rivulet is full of mud and trash.

141 Buildings in Ciliwung Rivulet Demolished

"The river has not been dredged around 30 years. Its depth is currently only 50 centimeters," said, Sunday (2/14).

He added, as many as four heavy equipments are deployed to dredge the river up to 3 meters depth. Additionally, part of river's sheet pile will also be repaired.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1581 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1438 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1302 personFolmer
  4. Jalan Kebon Kelapa I Repaved

    access_time07-07-2026 remove_red_eye1095 personNurito
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye966 personDessy Suciati